Projects

   Projects executed in the past:            
 

HOUSING PROJECT IN ARMENIA 

325 low cost ECOTECH homes for the victims of the earthquake in 1988

325 homes produced, shipped and built up within a period of 4 months only

                      

Pre fabricated homes, duly export packed, are loaded in trucks for the long trip to Armenia

                            

Start of the construction of the houses